Energy & Utilities

Critical national infrastructure protected with industrial zero-trust segmentation.

Power GenerationRenewable Solar/WindGrid TransmissionOil & Gas

Secure SCADA/ICS telecontrol networks, substation LANs meeting IEC 61850 specifications, and optical ring topologies resilient to harsh electromagnetic environments.

THE AUDIT YOU HAVE TO PASS
IATF 16949
IEC 62443
DPDP Act
WHAT IT REQUIRES OF IT
Controlled change
Traceability retention
Segregated OT
WHAT WE BUILD
IT / OT zones
Access control
Immutable backup
Change log
EVIDENCE YOU CAN HAND OVER
Network diagrams
Access records
Restore evidence
IT IS THE BACKBONE OF YOUR COMPLIANCE POSITION

Every control an auditor checks is something infrastructure has to produce.

The audits you have to pass

Every one of these asks IT for something. We build the controls that produce it.

IATF 16949

Systems holding quality records fall inside audit scope. Change control, access rights and retention all become evidence.

Customer supplier audits

OEMs assess their supply base. Current diagrams, patch status and a tested restore are what separate a finding from a clean report.

IEC 62443 & OT security

Zoning and conduits between IT and production, with documented crossing points and monitoring at each boundary.

Recall traceability

Part-level data retained and retrievable for years. That is a storage tiering and immutability design problem.

RoHS, REACH & product data

Electronics and chemical producers hold substance and formulation records that must survive audits and hardware generations.

DPDP Act 2023

Employee, contractor and visitor data across HR, biometric access and CCTV now carries consent, retention and breach obligations.

What changes for you

Three outcomes that decide whether you win the contract, not whether IT looks tidy.

Audits are answered from a folder

Diagrams, access logs and restore evidence maintained continuously, so an audit request takes minutes rather than a fortnight.

New customers clear you faster

Supplier onboarding questionnaires are answered accurately first time, which shortens the qualification cycle.

A breach stays off the shop floor

Segmentation means an office incident cannot reach a PLC, so the incident is contained instead of a stoppage.

How we build it

Each stage produces something an auditor would accept.

01

Map

Every device, flow and record system inventoried against what your auditors ask for.

02

Segment

IT and OT separated with documented, monitored crossings.

03

Evidence

Logging, retention and backup configured to produce audit artefacts automatically.

04

Rehearse

Restore tested and documentation reviewed before the auditor asks.

Audit evidence you can hand over

Documentation is the deliverable. All of it is yours, in the format assessors expect.

Current network diagram with IT and OT zones marked
Access control matrix by system and role
Change log covering all infrastructure modifications
Backup schedule with dated restore test evidence
Retention design mapped to traceability obligations
Patch and firmware compliance report

SCADA & Utility IT Security Checklist

Essential security controls for electrical substations and industrial control systems.

Download the PDF

Planning an IT Audit or Infrastructure Assessment for Energy & Utilities?

Get an on-site technical assessment and audit-readiness review from our certified enterprise architects.

AppsT
AppsTAI
👋 Need quick IT help or consultation?
AppsT
AppsTAI
👋 Need quick IT help or consultation?