Structured Cabling

Cabling done once, and documented properly.

Cat6 / Cat6A / Cat7Fibre backboneRacks & containmentFluke certification

Network cable installation is the one layer you cannot fix with a software update. We survey the site before specifying, install for the remaining life of the building, and hand you certification for every link.

BUILDING & INFRASTRUCTURE ARCHITECTURE
Floor 2 · office
48 outlets · Cat6A
Floor 1 · production
Industrial-rated, sealed
Ground · server room
Racks, panels, fibre entry
Fibre riser
OM4 / OS2
Every link Fluke-certified · Test report, as-built drawings and port schedule at handover
PASSIVE OUTLIVES THREE GENERATIONS OF ACTIVE KIT

Which is why it is specified for the building, not today's switch.

What we deliver

Six things, done together. Buying them separately is what creates the gaps.

Copper cabling

Cat6, Cat6A and Cat7 horizontal cabling, terminated and dressed to standard.

Fibre backbone

Single-mode and multi-mode risers, fusion spliced and OTDR tested in-house.

Racks & patch panels

Cabinets, PDUs and panels populated to a labelling scheme agreed before work starts.

Containment

Trays, conduit, ducting and fire-stopping at every penetration.

Fluke certification

Every permanent link and channel tested, with the report handed over.

As-built records

Drawings and port schedules that match what was actually installed.

What changes for you

Three outcomes that show up on the operations side, not the IT budget line.

Faults become findable

A labelled, documented estate turns a two-hour hunt into a two-minute trace.

No second visit in six years

Specified for the bandwidth you will need at the end of the building's life, not today's switch.

Audit evidence on file

Test certificates and drawings are handed over, so a customer audit is answered from a folder.

How we deliver it

Each stage produces something you can check before the next one starts.

01

Survey

Routes, containment capacity and access constraints recorded on site.

02

Specify

Cable grade, containment and labelling scheme agreed in writing.

03

Install

Pulled, terminated and dressed, sequenced around your operations.

04

Certify

Every link tested, drawings and port schedule handed over.

What you receive at handover

Documentation is a deliverable, not a courtesy. All of it is yours to keep.

Fluke test certificate for every installed link
As-built drawings showing routes and outlet positions
Port schedule mapping outlets to patch panels
Labelling schedule and naming convention
Photographic record of containment and rack build
Materials list with part numbers and warranty terms

Structured Cabling Specification Checklist

Twenty questions to put to any cabling contractor before you accept a quotation — including the four that most quotations quietly leave out.

Download the PDF

Planning a Structured Cabling Architecture Assessment?

Get an on-site technical assessment, Fluke-certified site survey, and BoQ validation from our senior infrastructure architects.

AppsT
AppsTAI
👋 Need quick IT help or consultation?
AppsT
AppsTAI
👋 Need quick IT help or consultation?